Home > News > How to set the control for the slitter(1)
How to set the control for the slitter(1)
- 2018-11-24-

< span="" style="background: rgb(246, 246, 246); font-family: Arial; font-size: 16px;">  You know Splitters? You know slitting machine How to set controls? Today, You Zheng Hengguang Xiaobian has compiled for youHow to set the control SplitterRelated information,If you are interested, and XiaobianLet's see it together!

  Change specifications, paper core on the inner and outer winding arms, pressure The rollers are in the ready state, informing all personnel to leave the machine and ready to run. Put ANTI-STAICBARS on the main console in AUTO, READYTORUN is turned on, and MACHINERUN is started. When the inner and outer ends of the machine are stopped, use the unload button to place the film on the prepared unloading cart, cut the film and attach the film roll with the sealant. Use the collet release button to release the collet and check that the film core has left the core. If it is still stuck on the core, manually remove the film manually.

  After ensuring that all films leave the chuck on the cart, use the membrane button to purchase points When cutting a blade, you must first understand your needs. What kind of blade do we need to buy? Don't look at the appearance of the blade or buy it at a cheap price. The blade you bought is definitely not. It is right for you, the quality of this blade will not be very good. It will be broken for a while.

  When buying a blade, don't always pursue branded merchandise. It is best to buy a suitable electrical isolation switch (set in front of the electric control cabinet), press the EMERCENCYSTOPRESET and READYTORUN buttons, the key to open the MACHINE to RUN (on the main console) check the voltage (380V), the current is correct, stable . Open the hydraulic system power switch (set on the main hydraulic drive frame), check that the main hydraulic drive system oil level and pressure gauge display is correct and stable.

  Open Pneumatic Shutoff Valve (Set in the pneumatic control cabinet under the intake pipe Top), check if the air pressure is correct (not less than 6.0 bar) and stable. Set the slitting menu according to the type, thickness, length, width, etc. of the film arranged in the slitting plan.